Assess rooftop solar proposals

Distinguish generation, on-site consumption and credible financial assumptions.

Match generation to demand

A PV system generates electricity according to solar conditions and system performance. Compare an hourly or otherwise suitable time-profile of generation with the site load. Annual generation alone cannot determine self-consumption. Distinguish energy in kWh from capacity in kW or kWp.

Check the site and contract

Ask qualified professionals to review roof strength and remaining roof life, shading, electrical protection, fire safety, safe maintenance access and commissioning. Confirm current local grid-connection, construction and permitting rules with the competent parties. Clarify ownership, warranties, maintenance responsibilities, curtailment and what happens when a lease ends.

Worked example — fictional rooftop

An installer estimates 100,000 kWh/year. A load-profile model estimates 75,000 kWh will be consumed on site and 25,000 kWh exported or curtailed. At an assumed avoidable cost of VND 2,000/kWh, gross on-site savings are VND 150 million/year. Assume zero export revenue until a lawful, documented arrangement is confirmed. Subtract operation costs and other project expenses in the cash-flow model. Do not count the full generation as avoided purchased electricity.

Practice

Request generation assumptions, hourly load matching, shading and loss estimates, a structural assessment, grid and safety documentation, equipment specifications, commissioning plan and maintenance proposal. Record uncertain export and tariff assumptions as unresolved. Require measured production and consumption data after commissioning.

Knowledge check

Does a 100 kWp array produce 100 kWh each day? Answer: no. kWp describes rated capacity; energy depends on irradiation, operating hours, losses and other site conditions.

References

US Department of Energy — Photovoltaic installation and commissioning

US Department of Energy — Solar operation and maintenance resources