Document both support and uncertainty
Prepare an index containing project scope, source versions, criterion mapping, technical calculations, applicable environmental documentation and outstanding questions. Separate documents that exist from those requested, expired or under review. A file upload does not prove authenticity, validity or applicability.
Prioritize gaps by consequence
A missing document may affect legal compliance, technical evaluation, environmental risk or lender processing. Identify the consequence and the responsible reviewer before assigning priority. Avoid assuming every SME needs the same permit, independent audit or certification. Use applicable requirements and qualified advice.
Worked example
A fictional cold-storage project has a supplier specification and three months of electricity bills but no comparable baseline for peak-season demand. Record the supplier data as design evidence and the seasonal baseline as a gap. Ask an engineer to define a comparable reference period. Ask the lender what evidence is needed for its product. Do not change the assessment to confirmed green until the relevant confirmation requirements have been met.
Practice
Prepare a review packet with four parts: one-page project description, criterion matrix, evidence index and next-action log. Include unresolved legal questions and whom to consult. Share only appropriate records through authorized channels.
Check your understanding
How should you treat an unknown eligibility criterion? Mark it needs verification, record the exact missing information and seek review. Do not invent a positive or negative result.
Educational material for preliminary preparation, not legal advice, a formal green classification, certification or a lending decision. Confirm the current applicable rules and the lender’s requirements. All numerical examples are fictional.