LESSON 02

Build controls and evidence

Assign responsibility, document implementation and follow corrective actions.

Distinguish policy from practice

A policy states intent. A procedure explains how work is done. Records show what happened. For each significant risk, identify all three where appropriate, plus a person responsible for review. A signed policy without training, inspection or action records cannot demonstrate implementation.

Use a practical control cycle

Set a specific action, deadline and accountable owner. For worker safety, prioritize prevention and risk controls designed by competent personnel, consult workers, and maintain incident and near-miss reporting without retaliation. For suppliers, use risk-based checks and a channel for concerns; do not assume a signed declaration resolves all risks.

Worked example — fictional SME

An inspection finds three blocked emergency exits. The facility manager clears the exits and implements daily checks. A reviewer later confirms unobstructed routes and investigates why the blockage recurred. Evidence includes inspection dates, corrective action and verification records. A photo taken once is not sufficient evidence of continuing control.

Practice

Select three priorities from the risk register. For each, write a measurable completion condition, owner, due date, evidence location and verification step. Define who reviews overdue or ineffective controls. Share personal or worker information only with authorized reviewers and avoid including personal identifiers in general lender packs.

Knowledge check

Is a completed action automatically an effective control? Answer: no. Verify the intended outcome and whether it continues to hold in normal operations.

References

ILO — Guidance for employers on occupational safety and health

IFC — Environmental and Social Management System implementation handbook

OECD — Due diligence for responsible business conduct