Review completeness and consistency
Check every source from the boundary register against the activity worksheets. Reconcile periods, duplicate bills, fuel stock, unit conversions and factor versions. Flag missing observations; where estimates are justified, explain the method and uncertainty. Do not interpret missing data as no emissions. Keep the original evidence and calculation versions.
Report gross inventory results
Present the boundary, period, methodology, Scope 1 total and Scope 2 totals by applicable method, material exclusions and limitations. If Scope 3 is incomplete, say so. Do not deduct offsets or project avoided-emissions estimates from gross Scope 1 and 2 inventory totals. A project benefit comparison and an organizational inventory answer different questions.
Worked example — fictional inventory
Suppose Scope 1 is 12 tCO2e and location-based Scope 2 is 60 tCO2e: their illustrative subtotal is 72 tCO2e. If an independently supported market-based Scope 2 total were 45 tCO2e, the alternative subtotal would be 57 tCO2e, not 117 tCO2e. If a project model predicts 8 tCO2e avoided, report the estimate separately rather than subtracting it from 72 or 57. These figures assume complete data within the stated example boundary.
Practice
Create a signed internal review sheet with boundary, source register, missing data, factor references, calculation checks, gross results and reviewer comments. Establish a base-year recalculation policy under the selected framework for significant changes. Monitor updates to GHG Protocol: its July 2026 announcement describes ongoing consolidation and future consultation, not an already effective replacement standard.
Knowledge check
Can an internal Scope 1 and 2 calculation be described as verified or carbon neutral? Answer: no. External verification, neutrality claims and any statutory reporting have separate requirements. Describe exactly what was calculated and reviewed.
References
GHG Protocol — Corporate Standard
GHG Protocol — Calculation Tools FAQ