LESSON 01

Define inventory boundaries and scopes

Identify sources and choose a consistent organizational and reporting boundary.

Start with the reporting entity

List legal entities, sites, leased assets and operations. Decide which consolidation approach is appropriate under the chosen reporting framework: equity share, financial control or operational control. Document the rationale and treatment of each site, including shared or leased facilities. Set a reporting period and a responsible inventory owner.

Understand the three scopes

Scope 1 covers direct releases from sources included in the organizational boundary, such as fuel combustion or refrigerant leakage. Scope 2 covers indirect emissions from purchased or acquired electricity, steam, heat and cooling consumed by the organization. Other indirect value-chain emissions fall within Scope 3 categories. Classifying a source depends on the boundary and accounting rules, not merely on who pays an invoice.

Worked example — fictional manufacturer

Assume a manufacturer uses operational control and operates a diesel boiler, owns production equipment and buys grid electricity for its factory. Boiler combustion belongs in Scope 1; purchased electricity used on site belongs in Scope 2. An independent carrier transports purchased materials; relevant transport emissions may belong in Scope 3. Review leased vehicles and outsourced processes individually.

Practice

Prepare a source register with site, equipment or activity, owner/operator, energy or gas, proposed scope, rationale, data custodian and evidence. Record uncertainty and excluded sources. Check separately whether the business is subject to Vietnamese statutory reporting obligations or sector-specific methods.

Knowledge check

Is a Scope 1 and 2 inventory automatically a complete corporate footprint? Answer: no. Relevant Scope 3 emissions and other reporting requirements may still need assessment; describe the coverage explicitly.

References

GHG Protocol — Corporate Standard

GHG Protocol — Standard development update, 29 July 2026