Preparing technical evidence for rooftop solar financing

A commercial rooftop solar checklist for SMEs: load profile, roof suitability, generation assumptions, project costs and operational evidence.

Start with the electricity you actually use

A rooftop solar quotation often leads with installed capacity and annual electricity generation. For an SME, the first question is how much of that generation the business can use under its actual operating schedule. A large roof is not enough to establish commercial feasibility.

Collect a representative year of bills and, where possible, interval meter data. Separate working days, weekends and seasonal shutdowns. Record tariff periods, demand charges and the site’s plans for expansion or relocation. A daytime factory and a business that mainly operates at night can have very different self-consumption profiles.

Check the roof and electrical system

Before accepting a design, confirm roof ownership or lease rights, remaining roof life, existing warranties and maintenance access. Ask a qualified structural professional to assess loading, mounting suitability and relevant wind or other site conditions. The US Department of Energy commercial rooftop and PV commissioning guidance offers useful technical reference points; it does not establish local permitting requirements.

Have qualified electrical and safety specialists assess the connection arrangement, protection systems, metering, emergency access and commissioning plan. Confirm applicable local approval, fire safety, connection and export rules with competent parties. Do not infer permission to export from a vendor’s proposal.

Challenge the generation forecast

Request a monthly generation model with equipment specifications, orientation, shading, losses, weather assumptions and expected degradation. Distinguish DC capacity in kWp, AC inverter capacity in kW and energy produced in kWh. Compare output scenarios and identify who owns the generation estimate.

Illustration: a proposed system generates 120,000 kWh in a representative year. If 90,000 kWh are used on site at an assumed avoided variable tariff of VND 2,000/kWh, gross avoided electricity purchases equal VND 180 million. The remaining 30,000 kWh must be assessed under the actual export or curtailment arrangement; if revenue is not confirmed, assign no export revenue in the base case. These are hypothetical values, not a generation or price forecast.

Build the investment and operating file

Include installation, structural work if needed, electrical integration, professional fees, commissioning and any roof repair costs. Estimate insurance, cleaning, maintenance, equipment replacement and downtime. Compare the financing tenor with useful life and the remaining lease period. Assess who bears performance and operating risks.

Agree how meters and monitoring reports will be used to compare actual generation and self-consumption against forecasts. Maintain the inspection, commissioning and warranty documents, plus an owner for routine checks.

What to discuss with your lender

Bring the site and design information, load and generation model, cash-flow scenarios, approvals register and monitoring plan. Ask which environmental criteria and technical documents the lender requires. A technically viable solar project may still fail credit or regulatory checks; do not treat the quotation as a loan approval.

Sources & further reading

Vietnam / international reference

Educational information only; not a legal opinion, formal green classification or credit decision. Verify applicable rules and lender requirements before acting.