Policy

EU CBAM in 2026: what Vietnamese SME exporters should prepare

A practical guide to product scope, importer responsibilities and embedded emissions data for suppliers selling into EU value chains.

Check the product before building a reporting system

The European Union’s Carbon Border Adjustment Mechanism (CBAM) entered its definitive period on 1 January 2026. It applies to specified goods in six initial sectors: cement, iron and steel, aluminium, fertilisers, electricity and hydrogen. Not every product made with steel or aluminium is automatically covered. Establish the actual customs classification and check the applicable product scope with the importer or customs adviser. A business supplying components to another manufacturer may receive requests for information even when it is not the direct exporter of covered goods.

The European Commission published guidance for non-EU installation operators in August 2026, including sector-specific documents and a guide to embedded emissions calculations. Start with the Commission’s current sector pages rather than reusing a transitional-period reporting template.

Separate the importer from the producer

CBAM compliance responsibilities under EU rules generally fall on the relevant EU importer or indirect customs representative acting as the authorised declarant where required. A Vietnamese producer may need to provide installation and production information, emissions data and supporting evidence for its customer. Confirm who will compile, review and submit each item. Commercial arrangements can allocate data tasks or costs, but they do not automatically transfer legal obligations.

As at 26 November 2026, the EU’s mass-based exemption framework includes an annual cumulative threshold of 50 tonnes of net mass for specified covered goods, assessed at importer level; electricity and hydrogen are not covered by that mass-based exemption. Do not interpret this as a threshold per Vietnamese supplier or shipment. Ask the importer to confirm its applicable obligations under the current rules.

Set up a product-level evidence file

For each affected product, record the customs code, production installation, process description, output quantities, relevant inputs and energy records. Keep purchase invoices and production logs aligned to the reporting period. Use the sector-specific calculation method, including applicable precursor information and verification requirements. Do not assume a company-wide Scope 1 and Scope 2 total can be divided by all production to yield a compliant CBAM value. System boundaries, relevant emissions and allocation methods may differ.

Respond to a customer request without inventing data

Suppose a buyer requests emissions data for two product families manufactured on the same line. Map shared and product-specific measurements, then identify missing data and the applicable allocation method. Do not enter zero for unmeasured inputs. State which figures are measured, calculated or unavailable, provide a method reference and agree on the next evidence collection step. Ask about verification and the permitted treatment of missing information before submitting numbers.

Connect preparation to investment planning

Better submetering or process efficiency may support more reliable data and lower energy use, but neither guarantees a lower CBAM cost or access to green credit. Assess the environmental and financial benefits independently. Maintain a dated record of the guidance used and recheck the rules before each reporting cycle or major commercial commitment. This guide is educational, not a customs classification or legal determination.

Sources & further reading

Vietnam / international reference

Educational information only; not legal, technical or financial advice, formal green classification or a credit decision. Verify current requirements and contract terms.

VerdeSME Toolkit

Explore VerdeSME learning resources

Build your understanding before preparing a financing application.

Explore Learning