From energy savings to a financing plan: a worked SME example

Turn estimated electricity savings into a financing discussion using incremental costs, sensitivity analysis and a measurement plan.

Compare the investment with a realistic alternative

The relevant investment cost is not always the full equipment price. If a worn-out machine needs replacement anyway, compare the proposed high-efficiency unit with a credible conventional replacement. Include installation, controls and commissioning in both alternatives. If keeping the existing machine is the alternative, account for its remaining life and expected repair costs.

Measure the energy use of the affected process. A change in monthly bills can reflect output, weather, operating hours or tariff movements rather than improved efficiency. Establish a suitable baseline before installation, with a method for adjusting for changes.

Worked example: an efficient compressor

Suppose a conventional replacement would cost VND 400 million installed and an efficient alternative would cost VND 580 million. The incremental investment is VND 180 million. At equal production output, expected electricity savings are 50,000 kWh annually. Using an assumed avoidable electricity cost of VND 2,000/kWh gives VND 100 million gross annual savings. Additional maintenance of VND 10 million leaves VND 90 million net annual operating savings.

Incremental simple payback is VND 180 million divided by VND 90 million per year, or two years. This is a screening metric, not a project return calculation or a debt-service coverage ratio. If the business needs to finance the full VND 580 million purchase, repayment capacity must be assessed on that full financing requirement and the business’s broader cash flow.

Stress-test the expected benefit

If annual electricity savings reach only 35,000 kWh, gross savings become VND 70 million and net savings VND 60 million, extending incremental payback to three years. If the avoided electricity cost falls to VND 1,600/kWh while savings remain 50,000 kWh, net savings become VND 70 million, with payback about 2.57 years.

All inputs are invented for education, not supplier quotes or official tariffs. Build a year-by-year cash-flow model that includes financing costs, tax effects where relevant, replacement costs, downtime and expected equipment life. Compare alternatives using a suitable discount rate as well as simple payback; do not assume savings remain constant forever.

Make savings measurable

Define which power meters, operating logs and output data will be used. Identify the baseline period and conditions, and who reviews changes after installation. US Department of Energy measurement and verification guidance provides a reference for comparing pre- and post-installation energy use. Select a method proportionate to the project’s size and uncertainty.

Prepare your financing conversation

Summarize the base and downside cases, total and incremental investment, financing needed, projected cash flow and evidence plan. Ask the lender about its repayment assumptions and whether any green-finance criteria apply. A short payback does not establish creditworthiness; existing obligations, working capital and business resilience still matter.

Sources & further reading

Vietnam / international reference

Educational information only; not a legal opinion, formal green classification or credit decision. Verify applicable rules and lender requirements before acting.

Learning Centre

Explore VerdeSME learning resources

Build your understanding before preparing a financing application.

Explore Learning